|
IBM System x servers and storage equipment customization upgrade services, the allocation required by upgrading services. |
IBM storage devices customization upgrade services, the allocation required by upgrading services. |
|
1、 IBM RS6000, POWER5 server and storage equipment customization upgrade services, the allocation required by upgrading services. |
|
|
|
|
|
|
|
|
|
|
|
|
One case, IBM Minicomputer hardware environment are as follows: a two p650 Minicomputer SMEs IBM, 2-way 1.45 CPU, two 73 hard drive, 2 gigabytes of memory and other environment. |
|
|
|
|
|
|
|
|
|
|
|
|
According to have to upgrade goal and achieving IBM two p650 Minicomputer new configuration: 4-way 1.45 CPU, two 73 drives, 4G memory environment. |
1.1)Customers upgrading Background: Application of production mainframe environment, the continuing need based on business need to upgrade 2-way 1.45 CPU, 2G of memory. |
1.2)According to the accessories required to upgrade the program are as follows: |
a)Upgrade mainframe models:7038-6M2 Rack Server 1:pSeries 650 Model 6M2 CEC。 |
b)Upgrading CPU Model:5208 2-Way 1.45 GHz POWER4+ Processor Card。 |
c)Upgrading memory models: 4452 2048MB (4x512MB) SDRAM DIMM Memory。 |
1.3)According to engineers to develop customer needs upgrading program. |
1.4)Former customers need to upgrade preparations for the environment and the needs of customers with the system administrator work and has done a lot of preparation work. |
1.5)Business spare parts for upgrades, engineers prepared to upgrade the hardware environment. |
1.6)Engineers and upgrading customers develop mainframe time. |
1.7)Engineers and customers develop mainframe upgrade in the process of rollback mechanism. |
1.8)Engineers and customers upgrade after tests. |
|
1.9)Engineers and customers together, the upgraded application on the mainframe line test, test the engines performance. |
1.10)Acceptance of Engineers to fill in escalating single. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Customization Upgrade (Case 1), a public institution IBM two p650 Minicomputer, 2-way 1.45 CPU, two 73-gigabyte hard drive, 2 gigabytes of memory and other environment. |
|
|
|
|
|
Customization Upgrade (Case 2), a public institution IBM two H85 Minicomputer, 2-way 450 CPU, two 18.2 hard drive, 1G memory environment. |
|
|
|
|
|
Custom escalation case (case 3), a SME units IBM two H80 Minicomputer, 2-way 450 CPU, two 18.2 hard drive, 1G memory environment. |
|
|
|
|
|
Custom escalation case (case 4), a SME IBM two 270 Minicomputer, 2-way 450 CPU, two 18.2 hard drive, 1G memory environment. |
|
|
|
|
|
Custom escalation case (case 5), a chemical enterprise IBM two p630 Minicomputer, 2-way 1.2 CPU, two 146-gigabyte hard drive, 1G memory environment. |
|
|
|
|
|
Custom escalation case (six cases), a chemical enterprise IBM two M85 Minicomputer, 2-way 600 CPU, two 18.2 hard drive, 2 gigabytes of memory and other environment. |
|
|
|
|
|
Custom escalation case (case 7), a public institution IBM two B80 Minicomputer, 2-way 450 CPU, a 18.2 hard drive, 1G memory environment. |
|
|
|
|
|
Custom escalation case (eight cases), a public institution IBM F50 Minicomputer, 2-way 332 CPU, a 9.1 hard disk, 512 memory environment. |
|
|
|
|
|
The custom upgrades (9 cases), a transportation industry IBM 615 Minicomputer, 2-way 1.2 CPU, two 73-gigabyte hard drive, 1G memory environment. |
|
|
|
|
|
The custom upgrades (10 cases), a telecommunications industry IBM S80 Minicomputer, four-way CPU, two 18.2 hard drive, 1G memory environment. |
|
|
|
|
|
The custom upgrades (10 cases), a securities industry IBM M80 Minicomputer, 2-way 450 CPU, two 18.2 hard drive, 1G memory environment. |
|
|
|
|
|
The custom upgrades (11 cases), a university IBM 170 Minicomputer, 1 Road 400 CPU, a 18.2 drives, 512 memory environment. |
|
|
|
|
|
|
|
|
|
|
The custom upgrades (12 cases), an automobile manufacturing enterprise IBM S7A Minicomputer, four-way 262 MHz CPU, two 9.1-gigabyte hard drive, 2 gigabytes of memory environment. |
|
|
|
|
|
The custom upgrades (13 cases), a university IBM S85 Minicomputer, 6 Road 600 MHz CPU, two 36-gigabyte hard drive, 4-gigabyte memory environment. |
|
|
|
|
|
|
|
|
|
|
|
Beijing, China Contact: |
1)Tel:(8610)82666745 |
2)Fax:(8610)82666745 |
3)Contact: Mr.huo |
4)Phone: 13301272832 |
5)E-mail: bjslkc@163.com |
6)Company:Beijing DeepBlue the Rongxin Technology Development Co., Ltd. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|