|
1、HACMP 4.3 takeover issues. |
1.1) operating systems: AIX 4.3.3 |
1.2) HACMP Version: HACMP 4.3 |
1.3) scene: Vol prepared machine datavg group to take over, however. |
1.4) my engineer on-site dual-machine debugging software, it can take over datavg by vol group. |
1.5) maintaining success. |
|
|
|
|
|
|
|
|
|
|
2、HACMP 4.5 Service IP address takeover issues. |
2.1) operating systems: AIX 4.3.3 |
2.2) HACMP Version: HACMP 4.5 |
2.3) scene: preparation for server IP addresses to take over, however. |
2.4) my engineer on-site dual-machine debugging software, server machine by IP address can take over. |
2.5) maintaining success. |
|
|
|
|
|
|
|
|
|
|
3、HACMP 5.1 takeover issues. |
3.1) operating systems: AIX 5.1 |
3.2) HACMP Version: HACMP 5.1 |
3.3) Field: host of file system and preparedness to take over, however. |
3.4) my engineer on-site dual-machine debugging software for mainframe and document preparation system can take over. |
3.5) maintaining success. |
|
|
|
|
|
|
|
|
|
|
4、HACMP 5.3 network synchronization problems. |
4.1) operating systems: AIX 5.3 |
4.2) HACMP Version: HACMP 5.3 |
4.3) scene: network topology synchronization error. |
4.4) my engineer on-site dual-machine debugging software for mainframe and network can be synchronized by the past. |
4.5) maintaining success. |
|
|
|
|
|
|
|
|
|
|
5、HACMP 5.4 network synchronization problems. |
5.1) operating systems: AIX 5.4 |
5.2) HACMP Version: HACMP 5.4 |
5.3) scene: network topology synchronization error. |
5.4) my engineer on-site dual-machine debugging software for mainframe and network can be synchronized by the past. |
5.5) maintaining success. |
|
2、HACMP two-plane software installation and maintenance Home |
|
Beijing, China Contact: |
1)Tel:(8610)82666745 |
2)Fax:(8610)82666745 |
3)Contact: Mr.huo |
4)Phone: 13301272832 |
5)E-mail: bjslkc@163.com |
6)Company:Beijing DeepBlue the Rongxin Technology Development Co., Ltd. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|